Contra Costa Stuck in the Past

Contra Costa Stuck in the Past

10/15/14 Filed in:

Contra Costa County’s Transportation Authority has released a draft 2014 Countywide Comprehensive Transportation Plan. It is a classic suburban plan that ignores the fundamental challenges posed by climate change and congestion. TRANSDEF submitted comments that attempt to identify a different, more realistic pathway. We believe these comments are widely applicable to suburbia.

The EIR for this Plan was a bizarre concoction. TRANSDEF’s comments identified it as “the most legally inadequate CEQA document TRANSDEF has ever seen.”